Swan Creek Lake Crossings
Sunbury County, NB

Eastern Designers & Company Limited performed value engineering, as well as the final design and preparation of contract documents for these two $6M, 157m long structures, part of the Fredericton-Moncton MRDC Highway project. The superstructures consist of 4 span
pre-cast, pre-stressed 1900mm deep bulb tees. Technical challenges included designing the substructures for a very soft and deep overburden requiring monitored pre-loading, tied-back abutments and sleeved piles. In addition, the river piers had unique pipe piled elevated bath tub type pier footings which precluded the use of more expensive deep seated steel sheet piled cofferdams.









Home | Services | Projects | Company | Contact


©Copyright 2003 - Eastern Designers & Company Limited - All Rights Reserved
Created by
DAve