Grand Manan Ferry Wharf
North Head, NB

The $11.6M ferry terminal at North Head, represents the latest developments in ferry boarding technology. The wharf/wave break consists of rock filled concrete caissons constructed using High Performance Concrete. The facility is equipped with steel fender panels faced with ultra high molecular weight polyethylene, mounted on high energy absorption rubber elements. The 55 m long lift bridge is raised and lowered on a state-of-the-art hydraulic system using 4 hydraulic cylinders with a 7.6 m stroke and ceramic coated rods. All bridge operations including the level, speed, location relative to the water level as well as the site lighting are controlled automatically by a PLC.





Home | Services | Projects | Company | Contact


©Copyright 2003 - Eastern Designers & Company Limited - All Rights Reserved
Created by
DAve